STEP

  • Extension and rehabilitation of the wastewater treatment plant of Saudrune

  • The Cugnaux station of purgation restructuring and extension is a good example of the necessary adaptation of installations and the increase of the life basin in Saudrune. Beyond the installation of modern effluent treatment process, REC imagined an architectural stage design emphasizing the modernization of installations, notably through a skin of a wave-like metallic cordons, linked to a progressive greening project management.

    In a constant pedagogical perspective, a specific circuit has been imagined, staging the cycle of wastewater cycle since its arrival up to its rejection into nature.

  • SIVOM de la Saudrune
  • REC architect - BET : OTV representative of the operation
  • 2017
  • 5 565 000 €